One-minute source brief
Questcorp and Riverside begin Phase 2B drilling at La Union’s Luis Hill
Questcorp Mining and Riverside Resources have started Phase 2B RC drilling at Luis Hill on the La Union Project in Sonora, Mexico. The program is designed to follow earlier results, test a deeper IP target, and step out later to the Union Mine target; all results remain pending.
Mining Stock Education · Original publisher source · Source release: 2026-11-16

Phase 2B drilling starts at Luis Hill
Questcorp and Riverside say Phase 2B reverse circulation drilling has begun at Luis Hill on the La Union Project in Sonora, Mexico. The first hole is a near-vertical step beyond earlier drilling, aimed at testing a deeper geophysical target beneath the Phase 1 gold intercept and probing the shale beds encountered in core drilling. The zone is still open along strike and at depth. [1]
Technical targets at Luis Hill and Union Mine
At Luis Hill, the company says the planned hole should reach about 350 m and test a newly identified +1 km induced polarization anomaly, as well as nearby intrusions that may host mineralization. At Union Mine, the second hole is intended to test feeder-structure continuity and three stacked mantos, using prior sampling and mapped geology as guides. [1]
Program scope and stated qualifications
The company says approximately 600 m of RC drilling is planned in two holes, and that the Phase 2 program could lead to further exploration work. However, it also states the results are subject to drilling performance, site conditions, approvals and other risks. The reported widths are down hole widths, and true width is unknown. [1]
Sources & footnotes
- Mining Stock Education · 2026-11-16 · Questcorp Mining and Riverside Resources Commence Phase 2B Drilling at Luis Hill, La Union Project, Sonora, Mexico. Checked 2026-11-20.