One-minute source brief
Spartan outlines Victorio economics in a preliminary study
The tungsten-molybdenum assessment models a potential operation; further studies, permits and financing remain ahead.
Spartan Metals Corp. · Original issuer source · Source release: 2026-11-19

What the study estimates
Spartan Metals released a new preliminary economic assessment for the Victorio tungsten-molybdenum project in New Mexico. Its base case models an after-tax net present value of US$2.14 billion at an 8% discount rate and a 30.9% internal rate of return. Initial capital is estimated at US$683 million. [1]
What those figures depend on
The model assumes a 24-year operating life and long-term prices of US$1,350 per metric tonne unit of tungsten trioxide and US$20 per pound of molybdenum. These are study inputs. The assessment includes inferred resources, and its projected economics are not assured. Resources are not mineral reserves. [1]
The next decisions
Spartan holds an option to acquire full ownership, subject to completing its terms. Further engineering, resource evaluation, metallurgical testing, permitting and financing are required before a development decision. The company intends to advance toward a prefeasibility study. [1]
Sources & footnotes
- Spartan Metals Corp. · 2026-11-19 · Original issuer release. Checked 2026-11-19.