One-minute source brief
Scottie adds Blueberry assays ahead of resource and feasibility work
New gold intervals support geological modelling while most assays from the completed drilling program remain outstanding.
Scottie Resources Corp. · Original issuer source · Source release: 2026-11-19

What the assays show
Scottie Resources reported further gold assays from the Blueberry Contact Zone at its Scottie Gold Mine Project near Stewart, British Columbia. Hole SR26-560 returned 25.5 grams of gold per tonne over 14.00 metres. A separate interval in SR26-522 returned 120.0 grams per tonne over 1.50 metres below the modelled Blueberry 5 vein. [1]
Keep the scale clear
The intervals are core lengths; true widths remain unestablished, with estimates ranging from 70% to 100% of core length. These selected intersections do not represent a project-wide grade. Scottie describes potential additions beyond existing resource blocks and the preliminary mine design; those possibilities still require evaluation. [1]
What follows
The company completed 61,578 metres of drilling in 227 holes during the program, with most assays still outstanding. Results are intended to inform an updated mineral resource estimate and feasibility study targeted for the first half of 2027. Further assays and modelling will show how the new intersections affect the project's resource and design. [1]
Sources & footnotes
- Scottie Resources Corp. · 2026-11-19 · Original issuer release. Checked 2026-11-19.