One-minute source brief
Yukon Metals reports contrasting gold and copper intervals at Birch
New drilling adds detail across the skarn system while geological controls remain under investigation.
Yukon Metals Corp. · Original issuer source · Source release: 2026-11-16

What the drilling found
Yukon Metals reported further assays from its Birch copper-gold project in Yukon. Hole BR26-008 returned 33.40 grams of gold per tonne over 1.0 metre. In a separate hole, BR26-010, a 30.8-metre interval averaged 0.17% copper and 0.14 grams of gold per tonne. The intervals describe different locations within the system. [1]
The important limits
Reported lengths are measured along drill core; true widths have not been determined. The narrow gold result should not be treated as the grade of the broader skarn. The company says the geological controls on that high-grade mineralization remain under investigation. [1]
What comes next
The results supplement drilling, mapping and geophysical work completed during the exploration program. Yukon Metals plans to combine those datasets to refine its geological interpretation and identify future targets. These are exploration results, with no new resource estimate announced in this release. [1]
Sources & footnotes
- Yukon Metals Corp. · 2026-11-16 · Original issuer release. Checked 2026-11-19.